Project summary

A major project which involved the design and installation of 1.7km of low-voltage and high-voltage electric mains to supply a major industrial project in Leyland. 

Supplying 106 industrial units was our biggest project yet and it involved the procurement and installation of three 1000kVa substations on site, with all the preparation work required by such works. 

Nature of works

  • Design through to approval for dual HV points of connection
  • 3x 1000kVA substations 
  • 1700m of LV and HV electric mains
  • 106x LV electric services
  • Associated metering